The proposed activity consists of two projects: Building 760-1G side building deck will be refurbished. Building 760-4G "Old Physical Fitness Gym"…
The dry pipe control valve, OS and Y control valve, and fire dept. connection check valve in 748-1A need to be replaced.…
Removal of grass/soil and concrete placement for sidewalk and display pad installation at 3 different locations located within J-area.…
Install HPC Time Server Antenna
Install new restroom trailer to replace existing 704-11K restroom trailer.…
A 2-ft-by-2-ft concrete pad will be installed and used as a survey monument to maintain staff gages properly at various SRS stream gage sites.…
CM 4211 Install Promabeam saw from laydown yard to 711-N. Work group to remove existing roller tables, and anchors on west side of 711-N Iron Worke…
The Plant Air System (PRA) is used to support the dry material silos.…
The expansion tank for the 218-H Chilled Water System is being replaced due to deterioration and the new model requires a minor modification of the…
LM is proposing to conduct routine inspection, monitoring, and maintenance activities at the Maybell West, Colorado, Uranium Mill Tailings Radiatio…