Advanced Engineering Fabrication, Assembly, Testing, Installation, and Maintenance of a table frame and robotic arm handling of objects.…
Remove existing air station off of private property and install a new air station at the old Williston barricade.…
An electrical resistance tomography (ERT) system (a geophysical method) will be tested on the low permeability geosynthetic cap over the closed Tre…
Installation of two new double-wide trailers in N-Area.…
Replace 731-N HVAC with a new system.…
Prepare and paint 10-foot metal building walls with a 10-foot parapet wall above the roofline.…
Collection of both upstream and downstream from the acid mine drainage treatment facility on site. It is anticipated that up to 4 pairs of samples …
Develop engineering, design, deployment, and operating plan for methane emissions monitoring platform
Conduct full scale natural gas compressor loop testing with hydrogen blending. Conduct design review and modify existing compressor loop for hydrog…
ESL conducts experiments using LIBS and Raman spectroscopy, develops prototype laser, detectors, and control systems for distributed laser sensing …