Remove and abate mastic tile floor and refinish concrete in 284-10F.…
Additional equipment storage is needed at the ATR facility for tools, fire protection equipment, barriers, fans, heaters, etc. The proposed work sc…
Railroad Crossing Replacement at Road F and Main Line (Hillman Siding/Signal 07) and Road 6 and Main Line (Signal 11).…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
Temporary Modification to provide an alternate power source to Motor Control Center (MCC) B907 from B202-2E during B9 outage.…
Mosquitos collected as larvae from SRS will be used on various behavior experiments. Research projects will focus on the looking at the behavior of…
Remodel 713-N Room 7and new HVAC Installation for Building 713-N Room 7…
Remodel to provide new plumbing, electrical, HVAC, fire protection, egress, asbestos remediation, and historic windows.…
FBI evidence examination and handling training using F-18, La-140, or Au-198.…
Build out infrastructure for NETL electric vehicle charging stations, including electrical equipment, underground conduit, concrete foundations, si…