Replace submersible pump with two Gould 3171 ST vertical Sump Pumps Size: 1.5x3-6/5V.…
The Breathing Air filters that are in the H-Canyon Warm Gang Valve Corridor no longer have filter elements available commercially. The filter housi…
This EEC is part of the F/H Laboratory (FHL), 773-A Laboratory Modification Project. This activity covers the preparation of radioactive standards …
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending (CDS) to the City of Burlington, Electric Departme…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Purdue University (Purdue) to develop, test, and validate a novel sc…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the Georgia Institute of Technology (GA Tech) to design, test, model…
Remove and abate mastic tile floor and refinish concrete in 284-10F.…
Additional equipment storage is needed at the ATR facility for tools, fire protection equipment, barriers, fans, heaters, etc. The proposed work sc…
Railroad Crossing Replacement at Road F and Main Line (Hillman Siding/Signal 07) and Road 6 and Main Line (Signal 11).…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…