Adding new vendor. Project coordination/management, develop the FEED study including the project cost estimat, Business Case Analysis, EH and S an…
As part of this Umbrella statement of work (SOW), Idaho National Laboratory (INL) and the contractor will build out a large scale, cyber-physical t…
Soil gas samples will be sampled using a soil gas probe and analyzed for the possible presence of radon.…
CM 4422 TS/Repair electric heater No. 1 at 717-10N.…
The 14C pump has degraded. The concrete which fills in the metal frame of the pump base has eroded away via acid intrusion and is leaking from 3rd …
Contruction group will be renovating 704-H creating construction and asbestos waste.…
Modification of 784-7A Airline and No. 2 Fuel Oil Supply for Temporary Boiler.…
CX-030429: Modification of Building 714-N for the Relocation of Lead Acid Battery Storage/Operations
Due to the future relocation of Salvage Yard Lead Acid Battery Storage Operations from 741-2N to 714-N, proposed modifications are needed to adequa…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted an emergency replacement of structure 15/2 on its existing Cheyenn…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency guy wires and anchors replacmenet on its existing Sterli…