This program will develop a "virtual power plant"(VPP) that leverages customer-sited batteries already installed in residential locations to export…
CONCEPTUAL DESIGN / DATA PROCESSING / PAPER STUDIES / REPORTING…
This Environmental Evaluation Checklist discusses the installation of piping, transformer, distribution panel, electrical components, and a catalyt…
Re-develop 22 piezometers and 2 inclinometers in the vicinity of the Steel Creek Dam, and 48 piezometers in the vicinity of PAR Pond Dam. Eleven (1…
Subcontractor will provide roof repairs at 704-H. The Subcontractor "will not" disturb the existing roof while performing these repairs on 704-H.…
Remove/Replace Air Handling Unit in the 704-K Building.…
Nondestructive exam of chilled water valve/piping and necessary repair of piping, valving, etc. in K-Area Purification Area.…
Installation of telecommunications, video capabilities, etc. in 705-K Administration Building.…
Renovate the interior of 713-N.…
To support the DOE mission, INL proposes to conduct smallscale research and development (R