NextEra Energy Marketing, LLC (the Applicant or NEM) has applied for authorization to transmit electric energy from the United States to Canada for…
This project would develop a novel mixed amine solvent specifically designed for capturing greater than 97 percent of the CO2 from natural gas comb…
Conceptual analysis and design study for a chemical looping process to decarbonize steel manufacturing.…
Risk Management toolkit drafting (risk management guidance for APPA members to enhance their risk management capabilities) Seminar/Workshop support…
Project mgmt, drilling, sample collection, field studies for example, well logging, computational simulations and modeling, community benefits, ris…
Replace Fire Alarm Panel / Components at 785-6A and 785-1A.…
The common copper service water header in 784-7A is being replaced with PVC piping. This activity is being performed to minimize the potential risk…
Deteriorated ACM (Asbestos Containing Material) window glazing will be removed and replaced at 760-11G.…
Subcontractor will provide roof repairs at 211-42H. The Subcontractor will not disturb the existing roof while performing these repairs on 211-42H.…
Remove/Reinstall 181 Drain Tank Outlet Valve and Replace Pump P-T181…