This EEC covers the replacement of broken post and damaged wood structure of 645-8N.…
The scope of work is to cut and extract five (5) asphalt cores as representative samples from the intersection in front of 704-1N and 715-3N to mea…
CX-030902: Repair Ceilings in Rooms 1, 2, 10, 10A, 9 and 9A and Replace Doors where Needed in 711-1N
This EEC covers the repair of ceilings in rooms 1, 2, 10, 10A, 9 and 9A in 711-1N and replacing doors where needed.…
The EEC covers replacing broken glass and painting the door at 717-3N.…
Vent 19 miniature equipment gas cylinders at 737-A.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Sterling-Sidney (…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 0/4, 11/5, 12/4, 14/1, 14/2, 15/2, 1…
Bonneville Power Administration (BPA) proposes to perform geotechnical testing, soil resistivity testing and water infiltration tests at the La Pin…
Contractor shall furnish all labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision necessary to perfo…
Contractor shall furnish all labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision necessary to perfo…