Modify Plant Airline and install equipment in 717-F machine shop. Rev.1 added to excess removed equipment and other equipment.…
Comprehensive Force-on-Force (CFoF) exercises that are conducted by Centerra - SRS are as realistic as possible and conducted in a safe manner. CFo…
Bonneville Power Administration (BPA) proposes to fund the Oregon Department of Fish and Wildlife (ODFW) to remove debris and improve an access roa…
Perform conceptual design studies to integrate the NRL Electrolytic Cation Exchange Module system within the OE Buoy wave energy converter to devel…
The objective of this effort is to design and install a modular, pilot-scale test unit to process 10,000 gallons per day (gal/day) or 7 gallons per…
Project management, simulation work,electrolysis to methanol short stack of individually connected cells to test and validate methanol production f…
Bench-scale research and development of an electrochemical reactor for direct ocean CO2 capture, as well as data analysis, technoeconomic analyses,…
The purpose of the proposed project is to replace the existing underground storage tanks (USTs) and fuel dispensers at Building (B) 611 with new ab…
The purpose of the proposed project is to replace the existing underground storage tanks (USTs) and fuel dispensers at Building (B) 611 with new aboveground storage tanks (ASTs) and fuel dispensers.
This activity prepares H-Canyon and Outside Facilities (H-OF) samples for metal impurities analysis by either Inductively-Coupled Plasma Mass Spect…