CX-030902: Repair Ceilings in Rooms 1, 2, 10, 10A, 9 and 9A and Replace Doors where Needed in 711-1N
This EEC covers the repair of ceilings in rooms 1, 2, 10, 10A, 9 and 9A in 711-1N and replacing doors where needed.…
The EEC covers replacing broken glass and painting the door at 717-3N.…
Vent 19 miniature equipment gas cylinders at 737-A.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Sterling-Sidney (…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 0/4, 11/5, 12/4, 14/1, 14/2, 15/2, 1…
Bonneville Power Administration (BPA) proposes to perform geotechnical testing, soil resistivity testing and water infiltration tests at the La Pin…
Contractor shall furnish all labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision necessary to perfo…
Contractor shall furnish all labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision necessary to perfo…
Design, analysis, and documentation of novel heat engine.…
Establish a field location and install a 10-year field experiment to simulate and study the movement of radionuclides through an artificial vadose …