Attenuate sound to prevent the transmission of sound from the northern secure portion of 773-41A to the unsecure portion by installing insulation.…
This EEC covers various general renovations for Building 723-A, such as flooring/cove base replacement, ceiling tile replacement, painting, and ele…
Remove/Replace Several Water Fountains in 705-K…
The proposed actions under this generic CX include Strategic Partnership Project proposals (formerly known as “work for others”) that use governmen…
Area of Interest 2: State Geological Data Gathering, Analysis, Sharing, and Engagement. The objective of this project is to build a database using …
Project Management, reporting and documentation,conceptual system design, technoeconomic analysis, technology gap analysis, life cycle analysis, co…
Univ of TN will conduct R and D on a CO2 electrolyzer and make/characterize a range of catalysts/catalyst supports. ORNL will provide guidance on t…
This project will design an optimized electrochemical system in anticipation of Phase 2 field trials in which sodium hydroxide (NaOH) will be elect…
Install Metal Carport at the 709-7G Fire Station Building.…
The U.S. Department of Energy (DOE) is proposing to modify the federal financial assistance agreement with Heliogen, Inc. for the “Capella Solar En…