The modification installs a total of forty (40) newly purchased HEPA filter fluid seal housings in place of existing tape-in-place filter housings …
Clean Out the Desiccant in Air Dryers at 766H.…
Due to the results of the vacuum testing on the 294-1H entry shack, a vacuum breaker needs to be installed on a sliding panel. This is required to …
Construction is to replace lighting fixtures with LED fixtures in HBL.…
Repair roof drain leak in elbow above conference room ceiling. Elbow and leak location (determined by Subcontractor) is covered by insulation with …
The U.S. Department of Energy (DOE) is proposing to provide federal funding to 11 projects selected under the Solar Energy Technologies Office Fisc…
Project mngmt; SCI assessment and plans;Address key tech and non-tech challenges in the region;Facilitate data collection/sharing and analysis;Eval…
This is a computational project only that will develop and optimize a direct air capture system that can capture 20 kg/day of CO2, and an integrate…
The City of Moorhead is expanding their Moorhead substation which will require WAPA to relocate both the FA-MH 230-kV and MH-MO 230-kV approach int…
WAPA proposes to repair erosion damage at selected access roads in western Fresno County between Towers 50-1 and 57-1.…