This Environmental Evaluation Checklist discusses the installation of piping, transformer, distribution panel, electrical components, and a catalyt…
Re-develop 22 piezometers and 2 inclinometers in the vicinity of the Steel Creek Dam, and 48 piezometers in the vicinity of PAR Pond Dam. Eleven (1…
Subcontractor will provide roof repairs at 704-H. The Subcontractor "will not" disturb the existing roof while performing these repairs on 704-H.…
Remove/Replace Air Handling Unit in the 704-K Building.…
Nondestructive exam of chilled water valve/piping and necessary repair of piping, valving, etc. in K-Area Purification Area.…
Installation of telecommunications, video capabilities, etc. in 705-K Administration Building.…
Renovate the interior of 713-N.…
To support the DOE mission, INL proposes to conduct smallscale research and development (R
The U.S. Department of Energy (DOE) is proposing to provide funding to the Town of Fairfield to construct a shade canopy structure at the Public Wo…
This revision includes an update to the experiment campaign at the Transient Reactor Test Facility (TREAT) at the Idaho National Laboratory (INL) a…