The purpose of this project is to synthesize getters from bismuth and zinc salts, which can then be used to test their iodine sequestration capabil…
Data analysis, modeling, mapping, cost estimates, and infrastructure design to develop a commercial scale CO2 storage complex.…
The Recipient team will investigate the feasibility of a Direct Air Capture (DAC) Hub at a midwest location anchored by Siemens Energy's solid sorb…
Develop and evaluate laboratory-scale physical, mechanical, and chemical separation techniques to extract/concentrate minerals from coal and coal b…
Fervo-execute a detailed feasibility study. AirMyne-DAC partner. UGS-assist with subsurface seq. pot. EGI-assist with geothermal systems modeling.…
731-1N Break Room Remodel Room No. 101.…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
Building 714-7N minor modifications to support K-Area missions and additional storage needs.…
192-2K Fire Water System Jockey Pump Controller Replacement (Electric and Diesel).…
H-Canyon and Outside Facilities TSR (S-TSR-H-00006, Rev. 17), Section 5.7.2.35 states that "The Backup Vessel Air Purge Program shall be establishe…