Upgrading 3 three-phase overcurrent protective reclosers and 4 single-phase overcurrent protective reclosers in, and near, Kelton Substation. All r…
Replacement of old poles (28), 13 transformers, 2250 ft of No. 1/0 acsr and 1350 ft of No. 4/0 acsr.…
DOE-LM is proposing to upgrade the pore water extraction system at the Rifle, Colorado, Disposal Site to prevent the rising water level in the disp…
BPA proposes to rebuild an approximately 3-mile-long segment of the White Bluffs to Richland No. 1 115-kilovolt (kV) transmission line from Stevens…
Non-radioactive laboratory testing using simulants to study solution oxidation of trace regulated organic chemicals using a 4 to 8 molar sodium alk…
The affinity of up to 132 Land Disposal Restricted compounds will be tested for various minerals and cementitious materials. Two techniques will be…
This EEC covers various general renovations for Building 773-43A, such as flooring/cove base replacement, door replacement, ceiling tile replacemen…
Heat samples in a high temperature furnace…
The 735-A change rooms are being converted into office space and the restrooms are being renovated to improve habitability
Roof Repairs to Stop Leaks at 722-8A.…