A Mettler-Toledo T50 auto-titrator will be used to titrate samples of the Next Generation Solvent in the Modular Caustic Side Solvent Extraction Un…
HVAC No. 2 for 211-8H Control Room is being replaced with a new (like for like) unit (WO No.2009200). Replacement will include replacing existing n…
This EEC will cover the repair of HB-Line exterior wall near the roof drainpipes to restore the damaged concrete to the original design capacity, t…
This initiative is examining the activities associated with reducing F Area Complex Operations and all facility support organization's schedule to …
Install UW drops for cubicle replacement in 703-43A. Revision 1 : Install 14 CAT6A UW Drops in 703-43A…
This Amended Determination follows the approval of additional funds, period of performance, and new project milestones to support the project team'…
This Amended Determination follows the approval of additional funds and period of performance to support the project team's small-scale, research a…