Touch up paint on 704-39G (storm shelter) and repair sheetrock/touch up paint in in 704-22G (conference room)…
Repair roof drain leak in elbow above conference room ceiling. Elbow and leak location (determined by Subcontractor) is covered by insulation with …
A number of lysimeters are to be installed around Saltstone Disposal Unit (SDU) 6 for detection of radioactive and chemical contamination in surrou…
Updated Project Title to include Mobile Hot Cell (MHC).…
Project team will conduct a Front-End Engineering and Design study of a pipeline system routing from gulf coast of LA to the central gulf coast of …
Installing relays and batteries at Crow Hill Substation Power Control Room on Mohegan Trust Land Installing relays and batteries at Fort Hill Subst…
Mercury amalgamation testing of silver sorbent precolumn for Jerome J405 mercury vapor analyzer will be performed at Aiken County Technology Labora…
This EEC covers various general renovation activities for 748-A such as sprinkler head replacement, electrical modifications, and drilling.…
Installation of explosion-proof oven in 735-A C-Wing North, to support the Gas Transfer Systems Technology group's mission.…