Grading of the exterior of 760-11G and the installation of a drainage system, to prevent further water intrusion.…
The site plans to complete additional roadway resurfacing on Road C this FY '24 (likely around the Mar/Apr timeframe). The section of roadway from …
The 151-1C and 151-2C substation batteries and battery racks will be replaced due to age and the batteries being obsolete.…
Spent Fuel Project Operations with Construction support to open the 204 Tank and 205 Tank to sample heavy water for disposal modeling. Work will be…
Replace All Non-Emergency Light Fixtures at 730-2B.…
Install Wi-Fi in Trailer 704-46Z and 45Z.…
This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is required. These excavation activiti…
The U.S. Department of Energy (DOE) is proposing to provide funding to GE Energy to design, develop, fabricate, and validate a low-temperature wast…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the Luzerne County Transportation Authority (LC…
The U.S. Department of Energy (DOE) is proposing to administer congressionally directed spending to the YMCA of Greater Nashua to install a rooftop…