The common copper service water header in 784-7A is being replaced with PVC piping. This activity is being performed to minimize the potential risk…
Deteriorated ACM (Asbestos Containing Material) window glazing will be removed and replaced at 760-11G.…
Subcontractor will provide roof repairs at 211-42H. The Subcontractor will not disturb the existing roof while performing these repairs on 211-42H.…
Remove/Reinstall 181 Drain Tank Outlet Valve and Replace Pump P-T181…
The flooring in 702-H will be replaced.…
BPA proposes to fund the Nez Perce Tribe (NPT) to survey and treat noxious weeds/invasive plants in the Lapwai Creek watershed to minimize their sp…
The GOPHURRS program seeks to simplify the construction of underground medium voltage (MV, 5 – 46 kilovolt) power distribution grids by adopting a …
50 Ohm Resistance Thermal Devices (RTD) shall be replaced with100 Ohm Platinum RTDs. Associated Recorder shall be reprogramed to accept the new 10…
Water Monitoring Equipment Deployment in F and E Area Basins…