The proposed project would be to demolish and dispose of three trailers at the Special Technologies Laboratory (STL) in Santa Barbara and replace t…
The Unlocking Lasting Transformative Resiliency Advances by Faster Actuation of power Semiconductor Technologies (ULTRAFAST) program seeks to devel…
The DynaCool Physical property measurement system (PPMS) employs a minimum amount of condensed liquid Helium-4 for cooling both the sample chamber …
999-2W Liquid Nitrogen (LN2) Delivery System - Correct CHART Phase Separator and Replace LN2 Piping…
Upgrade men's and women's locker rooms in 704-K. Revision 1 is specific to the replacement of existing vinyl sheet flooring and extending work dura…
Replace Lift Station Pumps at 607-44H.…
Construction is to repair pipe penetration at 700 basin, as well as seal the joint where the basin wall meets the basin floor.…
This activity will correct/replace the internal components of 285-11H cooling tower cells that have worn due to normal wear and tear.…
Replace 248-H Wet Chemical Agent Cylinder due to Age…
Laboratory testing to develop a prototype with the ability to separate freshwater from concentrated produced water, lab testing of building panels,…