Subcontractor 00000611 will perform roof repairs on 246-H. The Subcontractor will not disturb the existing roof on 246-H.…
SRTE will vent 1 cylinder of 2 percent O2 and Balance Argon (Cylinder
SRTE will vent cylinder containing 50 percent Helium and 50 percent Carbon Dioxide (Cylinder
The following work will be completed in the Functional Test Station (FTS): replace the filament and ion gauge for the Real Time Mass Spectrometer a…
At the A-Area Burning/Rubble Pits and Rubble Pit (731-A, -1A, and -2A)/Miscellaneous Chemical Basin/Metals Burning Pit (731-4A and -5A) Operable Un…
New field sites have been added. The objectives of this project are to investigate, design and scale-up the assessment of the benefits of bioenergy…
The U.S. Department of Energy (DOE) is proposing to provide funding to University of Texas at Austin (UT Austin) to design, develop, and evaluate a…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Louisiana State University and Agricultural and Mechanical College (…
The U.S. Department of Energy (DOE) is proposing to provide funding to Mojave Energy Systems, Inc. (Mojave) to design, develop, fabricate, and fiel…
Tehse include capabilities in neutronics, thermal hydraulics, structural-design analyses for small- and large-scale experiments, mechanistic and pr…