This activity relates to the operation of a shielded Avance NEO 500 Nuclear magnetic resonance (NMR) system. This system reads residual magnetism f…
Subcontractor will perform a roof replacement on 735-B. The Subcontractor will disturb the existing roof on 735-B.…
Bonneville Power Administration (BPA) is proposing to replace a section of failed fiber optic cable along the Shelton-Fairmount No. 1 transmission …
Bonneville Power Administration (BPA) proposes to fund the Oregon Department of Fish and Wildlife (ODFW) to annually monitor Chinook salmon (Oncorh…
Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and associated hardware and guy wires at specific …
Bonneville Power Administration (BPA) proposes required maintenance at BPA's existing Bellingham Substation in Whatcom County, Washington. The prop…