The Auger Spectrophotometer is a non-destructive technique used to analyze metal samples.…
Daily operation of microscopy and spectroscopy instruments in 735-A, D-137.…
This EEC covers the installation of tritium signs at 711-1N, 711-2N, 711-9N, 704-4N, 725-1N, 713-1N--1st floor, 713-1N--2nd floor, 717-10N, 717-8N,…
The failed roofing systems on the Assembly/910/911 roofs of 105-L will be demolished and replaced. This will prevent the numerous leaks that curren…
Pole K1225 needs to be replaced, and pole 37 needs repairs.…
The roof to the 294-H CAEX tunnel needs to be replaced due to age of structure.…
Fabricate and Install Replacement Trash Racks at 681-3G River Pump House.…
Renovation of the men's (Room E-62) and women's (E-61) restrooms in the Centerra-SRS Training Building 703-1B.…
To install distribution automation equipment on existing electric distribution circuits across Empire's service territory.…
Installation of field test coupon to pipeline at for 6-month period. Coupon will be remotely monitored for corrosion. Max area of 6'x6' will need t…