SRTE perimeter upgrades will involve: Aircraft Cable Refurbishment and Upgrades, placement of new jersey barriers. Placement of jersey barriers wi…
The I-Loop Boiling Water Reactor (IL-BWR) experiment will irradiate light water reactor (LWR) type fuel in the Advanced Test Reactor (ATR). The exp…
OCED is proposing to provide funding to Sutter CCS, LLC in support of the Sutter Decarbonization Project at the Sutter Energy Center, a natural gas…
Install new 1 inch rigid galvanized steel (RGS) conduit and conductors to fans VVS-FAN-1 and 2 at 776-1A and 776-4A.…
This EEC to cover renovations, repairs, and modifications to the metal siding and metal flashing of the outside of 786-A.…
The Kaplan and Lin lab are conducting rad and non-rad studies to investigate cement leachate impact factors for sediments.…
In order to protect the integrity of the Deionized Water Basin, over pressurization needs to be avoided. A pressure relief valve is accordingly bei…
Evacuating Air Handler Units 600, 700 and 800 in the 105-L Disassembly Area. These have been removed from service.…
D and R of K-Area Purification Steam Supply Line…
Filter replacement will be performed in front of inner roll-up door in the Truckwell Airlock.…