Grout Formulation & Variability Testing CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Louisiana- County - Lafourche CX(s) Applied: B2.5, B5.1 Date: 02/07/2012 Location(s): Louisiana Offices(s): Energy Efficiency and Renewable Energy
Rocky Reach-Maple Valley #1 Temporary Bridge Installation CX(s) Applied: B1.3 Date: 02/07/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Upgrade of the Existing Septic System at the Big Eddy Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/07/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Tangier Island - Multiple Solar Arrays CX(s) Applied: A1, B5.16 Date: 02/07/2012 Location(s): Virginia Offices(s): National Energy Technology Laboratory
Add Blanks in Central Hood Exhaust (CHEX) System Ductwork Between FLT-17 and FLT-18 CX(s) Applied: B2.3 Date: 02/06/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Cork Alternatives Project CX(s) Applied: B1.3Date: 02/06/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Microbial Monitoring of L-Area Basin Spent Fuel Storage Facility CX(s) Applied: B3.6 Date: 02/06/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation CX(s) Applied: B4.9 Date: 02/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Clean Start - Development of a National Liquid Propane Refueling Network CX(s) Applied: B5.22 Date: 02/06/2012 Location(s): California, Arizona Offices(s): National Energy Technology Laboratory