CH2MHill Plateau Remediation Company - Site Characterization and Environmental Monitoring CX(s) Applied: B3.1 Date: 09/24/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Rerouting of Power Lines at 100-D Reactor in Support of Site Remediation CX(s) Applied: B4.13 Date: 09/24/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Development and Productization of High-Efficiency, Los-Cost Building-Integrated Photovoltaic Shingles Using Monocrystalline Silicon Thin Film Solar Cells CX(s) Applied: A9, B3.6 Date: 09/24/2012 Location(s): California Offices(s): Golden Field Office
B28 Demolition National Energy Technology Laboratory Morgantown CX(s) Applied: B1.23 Date: 09/24/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Remove Odor Control System Located at the Southeast Exterior Corner of National Energy Technology Laboratory Morgantown Building 17 CX(s) Applied: B1.23 Date: 09/24/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
E85 (Ethanol) Retail Fueling Infrastructure Installation CX(s) Applied: B5.22 Date: 09/24/2012 Location(s): Florida Offices(s): National Energy Technology Laboratory
Elmwood Dog Kennel Repair (Hurricane Isaac) CX(s) Applied: B1.3 Date: 09/24/2012 Location(s): CX: none Offices(s): Strategic Petroleum Reserve Field Office
Ross Transformer Oil Terminal Upgrade CX(s) Applied: B4.6 Date: 09/24/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Underwater Active Acoustic Monitoring Network for Marine and Hydrokinetic Energy Projects CX(s) Applied: B3.3 Date: 09/24/2012 Location(s): Maine Offices(s): Golden Field Office
Innovative Ballasted Flat Roof Solar Photovoltaic Racking System CX(s) Applied: B5.15 Date: 09/24/2012 Location(s): Michigan Offices(s): Golden Field Office