Upgrade of the Existing Septic System at the Redmond Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Simulated Based Engineering User Center CX(s) Applied: B1.7, B1.15 Date: 02/08/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Replace the Roof on Building 235-F CX(s) Applied: B1.3 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Retention Basin Cover & Liner System Removal From Service CX(s) Applied: B1.28 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Electrochemical Fluorination in Molten Fluoride Salts CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Sampling of Legacy Material for Material, Control & Accountability (MC&A) Verification CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Grout Formulation & Variability Testing CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Louisiana- County - Lafourche CX(s) Applied: B2.5, B5.1 Date: 02/07/2012 Location(s): Louisiana Offices(s): Energy Efficiency and Renewable Energy
Rocky Reach-Maple Valley #1 Temporary Bridge Installation CX(s) Applied: B1.3 Date: 02/07/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Upgrade of the Existing Septic System at the Big Eddy Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/07/2012 Location(s): Oregon Offices(s): Bonneville Power Administration