Driscoll-Naselle #1 Tower Relocation CX(s) Applied: B1.3 Date: 09/26/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
September 26, 2013Driscoll-Naselle #1 Tower Relocation
CX(s) Applied: B1.3
Date: 09/26/2013
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to replace two steel towers that are under stress from landslides and have the potential of failure if not moved or replaced.
CX(s) Applied: B1.3
Date: 09/26/2013
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to replace two steel towers that are under stress from landslides and have the potential of failure if not moved or replaced.