This Amended Determination follows the approval of additional funds to support the project team's small-scale, research and development activities …
This revision includes the temporary use of the following rental equipment for a test at the Idaho National Laboratory (INL) Power Burst Facility (…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to PPG Industries (PPG) to test, develop process, and scale-up of a nov…
OCED is currently proposing to issue two additional voucher opportunities under the PIA: Voucher Opportunity 9: "Planning and Validation of Industr…
The 50-ohm resistance thermal device (RTD) for 15.3 will be replaced with a 100-ohm Platinum (Pt) RTD. The control system shall be reprogrammed to …
Configuration Changes Necessary for safe Operation of the Chemical Injection System Which Injects CL4132 to the Service Water Header.…
The current capacity of 607-7B Sanitary Lift station is undersized based on existing personnel loading in building 730-2B and 730-4B. The 607-7B sa…
Building 707-1F is in need of minor repairs/renovations prior to housing personnel in office spaces.…
Installation of industrial curtains in order to prevent the nesting of barn swallows at 292-2F.…
701-20G Correct Water Line Mounting at Barricade 1 per AOS (Acknowledgement of Scope).…