The scope of work will include prepping duct wall for paint, and applying paint coatings once wall has been prepped, Rev 1 The maintenance shop in …
The Emergency Operations Center (EOC) has operated beyond its expected lifetime and has become inadequate to provide necessary response for possibl…
This EEC supports activities post Cold and Dark status of Building 235-F. Revision 6 includes work in 701-1F, 720-F, 252-9F, and removal of perimet…
Install fault indicators onto existing powerlines.…
Circuit cards that are in need of repair have a conformal coating making it difficult to take measurements to identify non functioning components. …
This EEC covers disconnecting commodities to seatrains 763-118N and 763-119N to prepare for relocation.…
Replace a safety shower and associated piping in L-Area. The old unit is in bad shape and the filters are unavailable due to age.…
Replace obsolete TEF Furnace Extraction Turbomolecular Pumps. Design is required for installation of replacement model pumps and associated pump co…
Install HT-TCAP Feed/Product transfer Lines…
Replace/Upgrade Fire Alarm Control Panel, Modify Fire Alarm and Detection System and Fire Sprinkler Riser in Bldg. 221-33F.…