This DCP modifies the spare Mass Spectrometer 4 (MS4) footprint in 264-H. …
This Fourth Amended Determination follows the approval of additional funding, a new project partner, and an extended period of performance to suppo…
Kansas City National Security Campus (KCNSC), KCNSC25-04, Project No. 4939. Activity will take place at TA193, in the rightof-way (ROW) on the nort…
Upgrading mining site to 3-phase power. Trenching to place 3-phase line underground. Installation of a power vault and transformer. Installation of…
CX-033666: Establish Preventive and Predictive Maintenance to Enhance Grid Resilience in Fort Pierce
This project will involve the installation of 408 fault indicators and 18 automatic switches across 34 distribution feeders within the Fort Pierce …
Grid Resiliency project with new solid dielectric vacuum reclosers, capacitor bank, electronic controls/communications, air insulated switchgear an…
Paint F-Area steam pole brackets.…
Western Area Power Administration (WAPA), Rocky Mountain (RM) region proposes new formula rates for the Loveland Area Projects (LAP) transmission a…
1. Install new substation conduit and manhole system for 13kv distribution. 2. Install new conduit and manhole system for 13kv distribution. 3. En…
The Assembly side of 105-C has some insulation paneling that is coated with Asbestos Containing Material (ACM) mastic. A few panels have fallen and…