Bonneville Power Administration (BPA) proposes to fund Latah Soil and Water Conservation District (Latah SWCD) to perform maintenance at previously…
Replacement of storm sewer piping and culvert east and south of the parking lot would include selective demolition of existing area and grading alo…
Bonneville Power Administration (BPA) proposes to remove and replace approximately 213 marker balls on three transmission lines in Kootenai, Nez Pe…
The Department of Energy Loan Programs Office is considering whether to issue a Title XVII Energy Infrastructure Reinvestment Program loan guarantee to Wisconsin Power and Light for the Grant County Battery Energy Storage System Project.
This program will develop a "virtual power plant"(VPP) that leverages customer-sited batteries already installed in residential locations to export…
CONCEPTUAL DESIGN / DATA PROCESSING / PAPER STUDIES / REPORTING…
This Environmental Evaluation Checklist discusses the installation of piping, transformer, distribution panel, electrical components, and a catalyt…
Re-develop 22 piezometers and 2 inclinometers in the vicinity of the Steel Creek Dam, and 48 piezometers in the vicinity of PAR Pond Dam. Eleven (1…
Subcontractor will provide roof repairs at 704-H. The Subcontractor "will not" disturb the existing roof while performing these repairs on 704-H.…
Remove/Replace Air Handling Unit in the 704-K Building.…