Installation of an air filter into the plant air line that is feeding the plasma table in building 717-3N.…
In support of various R and D activities, gas chromatography will be used to analyze gas samples that may include (but not limited to) the followin…
The planned work is to replace the fuel oil pump for diesel fuel tank 619-2N located adjacent to building 717-8N.…
This EEC covers updating existing lighting in multiple N area shop buildings from High pressure sodium, metal halide, fluorescent, incandescent, et…
The work group shall provide the A-Area cooling water chemical building, 780-2A, with refurbishments to bring the building back up to adequate aest…
The project team will collaborate with Fermilab experts and experienced industry partners to integrate the RGD system into the trailer and prepare …
WAPA proposed to replace insulators along the ODA-TCY transmission line.…
The Saltstone Process Room ventilation is a once-through system not designed for continuous personnel occupation.…
ATR is planning to do some road/pavement improvements on many areas that are currently paved and some that are currently unpaved. Project activitie…
WAPA-UGP is proposing to extend existing formula rates (without any changes) for the P-SMBP--ED for the period of October 1, 2025, through Septembe…