Remove deteriorating wooden solar PV racking that is mounted atop powerhouse roof, thereby eliminating this threat to powerhouse structural failure…
Wooden pole replacement.…
Administrative and project management activities, building construction, site excavation and preparation, concrete pad installation, equipment inst…
Repaint fixed contamination at the distillation column area of 105-C.…
The Bundle Storage (MTR) Rack is Safety Significant Design feature that is located in Section 3 of the Hot Canyon of 221-H. This DCP replaces exist…
Handrails, anchor bolts and baseplates around L-Area (exterior) will be repainted to stop rusting. Other items may need to be painted such as bolla…
Repair 2 leaking roof drain pipes in 722-A. One is located over cube 131-F and the other is located in the radio shop room 130. …
Remove commodities connecting old Thermal Arc plasma cutter CLI No. N-717001-GSE-STE-480179-in 717-1N, prep for excess. Install new Hypertherm MAX …
The City of Lakota through Lakota Municipal Utilities will underground approximately 6.26 miles of overhead distribution line. …