Subfloor Repair/Replace and Carpet in 704-738K.…
Remove velcro, mud and paint walls in 730-2B, Room 222.…
A completed EQ is required for any TBD location sites/charging stations. A separate NEPA review is required for the TBD location sites. This CX cov…
The scope of this project include replacing wooden electric poles with steel ones and then installing software to enhance the grid's resilience.…
Project's primary objective is site characterization including water sample collection, drilling a USDW well, and aerial studies (Subtasks 4.7, 4.8…
The proposed project is to upgrade the fire alarm system for EBR-1 to meet the standards in the National Fire Protection Association (NFPA) Code, s…
This Idaho National Laboratory (INL) project is a collaboration to test an innovative overhead superconducting power line. The project will be cond…
H-Canyon and Outside Facilities TSR (S-TSR-H-00006, Rev. 18), Section 5.7.2.35 states that "The Backup Vessel Air Purge Program shall be establishe…
Installation of Single Wide Trailer at 711-6N.…
The JEOL JSM-6480LV SEM, along with all peripheral attachments, are to be removed and replaced by a new SEM and its needed peripheral attachments