Wisconsin Biofuels Retail Availability Improvement Network (BRAIN) CX(s) Applied: A1, A9 Date: 06/03/2014 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory
Disconnection of Utilities CX(s) Applied: B1.27 Date: 06/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Wisconsin Biofuels Retail Availability Improvement Network (BRAIN) - E85 Station Installation CX(s) Applied: B5.22 Date: 06/03/2014 Location(s): Wisconsin Offices(s): National Energy Technology Laboratory
Hyper Scratcher Tool: A Patented Oil, Gas, Disposal, & Injection Well Tool for Enhancing Production CX(s) Applied: B3.7 Date: 06/03/2014 Location(s): Michigan Offices(s): National Energy Technology Laboratory
Hyper Scratcher Tool: A Patented Oil, Gas, Disposal, & Injection Well Tool for Enhancing Production CX(s) Applied: B3.7 Date: 06/03/2014 Location(s): Michigan Offices(s): National Energy Technology Laboratory
Hyper Scratcher Tool: A Patented Oil, Gas, Disposal, & Injection Well Tool for Enhancing Production CX(s) Applied: A9 Date: 06/03/2014 Location(s): Utah Offices(s): National Energy Technology Laboratory
Flaming Gorge Microwave Site Communications Building Access Road Repairs, Daggett County, Utah (Amended) CX(s) Applied: B1.3 Date: 06/03/2014 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region
INL - Idaho Completion Project Environmental and Regulatory Services Activities CX(s) Applied: B3.1Date: 06/02/2014 Location(s): IdahoOffices(s): Nuclear Energy
Swan Valley-Teton Overhead Fiber Line Install CX(s) Applied: B4.6 Date: 06/02/2014 Location(s): Idaho Offices(s): Bonneville Power Administration
Crossman Peak Communication Site Lease and Equipment Upgrades at 5 Facilities CX(s) Applied: B1.19 Date: 06/02/2014 Location(s): Arizona, Arizona, Arizona, California, Nevada Offices(s): Western Area Power Administration-Desert Southwest Region