Nauticas Research Program CX(s) Applied: B3.6 Date: 08/07/2013 Location(s): Illinois Offices(s): Argonne Site Office
Abandon Metals Structures in N-Area CX(s) Applied: B1.23 Date: 08/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Heavy Mineral Separation CX(s) Applied: B3.6 Date: 08/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 773-52A CX(s) Applied: B1.3 Date: 08/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Roof Repair at 717-12S CX(s) Applied: B1.3 Date: 08/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Core Sampling of 703-A Roof CX(s) Applied: B1.3 Date: 08/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leak on 730-B CX(s) Applied: B1.3 Date: 08/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Curecanti-Lost Canyon 230-Kilovolt Emergency Repairs of Downed Conductor CX(s) Applied: B1.3 Date: 08/06/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Kiowa Creek-Weld 115-Kilovolt Transmission Line Culvert Replacement CX(s) Applied: B1.3, B1.33 Date: 08/06/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Transmission Line 3005, Structure 290 Replacement CX(s) Applied: B4.6 Date: 08/06/2013 Location(s): Oklahoma Offices(s): Southwestern Power Administration