Optimization Project Area #1 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07/26/2013 Location(s): Wyoming Offices(s): RMOTC
Abradable Sealing Materials for Emerging IGCC-Based Turbine Systems CX(s) Applied: B3.6 Date: 07/26/2013 Location(s): California Offices(s): National Energy Technology Laboratory
High Pressure Immersion and Reactive Transport Laboratory CX(s) Applied: B3.6 Date: 07/26/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Upper Jocko River Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Peninsula Light Company Line and Load Interconnection Request L0308 (Amendment) CX(s) Applied: B4.12 Date: 07/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Transmission Line 3016, Access Road Acquisition Project CX(s) Applied: B1.24 Date: 07/25/2013 Location(s): Oklahoma Offices(s): Southwestern Power Administration
Iona Relay Station Maintenance CX(s) Applied: B1.3, B1.11, B2.5 Date: 07/25/2013 Location(s): Idaho Offices(s): Nuclear Energy
Construction of an Autogas Refueling Network CX(s) Applied: B5.22 Date: 07/25/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Construction of an Autogas Refueling Network CX(s) Applied: B5.22 Date: 07/25/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
B-19 Roof Replacement and Fall Arrest System Installation CX(s) Applied: B1.15, B2.5 Date: 07/25/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory