CX-013882: Categorical Exclusion Determination

Replace Bayou Choctaw Brine Disposal/Recycle Piping in Pump/Pond Area CX(s) Applied: B1.3Date: 07/17/2015 Location(s): None ProvidedOffices(s): Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

July 17, 2015
Estimated Read Time   min

Replace Bayou Choctaw Brine Disposal/Recycle Piping in Pump/Pond Area
CX(s) Applied: B1.3
Date: 07/17/2015
Location(s): None Provided
Offices(s): Strategic Petroleum Reserve Field Office

Subcontractor shall furnish all labor, tools, materials, equipment, supplies, transportation, facilities, services and supervision required to replace the existing Bayou Choctaw brine disposal/recycle piping in the pump/pond area and the suction and discharge piping to the brine header. Piping includes aboveground and underground piping.

Document(s) Available for Download