Install a 14 feet x 14 feet concrete slab at 713-3N and a 17 feet x 17 feet concrete slab at 713-2N.…
766-H Room 1061/1066 Nurse Station modifications.…
Batteries are being charged/recharged in Room 107 of 264-H which produces hydrogen gas and is a safety hazard. Install hydrogen monitoring to detec…
Section 3 hot gang valve corridor vestibule AC unit is in failed condition and needs to be replaced. Stagnant air in head tower causes condensation…
The TEF Remote Handling Area (RHA) Crane has a scenario where radioactive material is being handled by the crane and a failure causes the inability…
Open Glovebox Maintenance (OGM) to replace multiple valves in GB-5. Rev. 1 created to extend activity end date, updated EEC to new version of EEC…
Install Unistrut to wall in Building 707-C Room 356 that will be used to securely mount a gun rack system.…
Construction to upgrade VTC in 730-1B (Room 344).…
Replace 2 sets of wooden stairs at 704-16B with aluminum.…
Installation of Wi-Fi in 708-1B.…