Verification of Capillary Pressure Functions and Relative Permeability Equation CX(s) Applied: A9, B3.6Date: 07/21/2015 Location(s): ArizonaOffices(s): National Energy Technology Laboratory
Interfacing MFIX with PETSc and HYPRE Linear Solver Libraries CX(s) Applied: A9Date: 07/21/2015 Location(s): North DakotaOffices(s): National Energy Technology Laboratory
Alaska North Slope Methane Hydrate Resource Evaluation CX(s) Applied: A9, B3.1, B3.11Date: 07/21/2015 Location(s): AlaskaOffices(s): National Energy Technology Laboratory
Novel Microemulsion Absorption Systems For Supplemental Power Plant Cooling CX(s) Applied: B3.6Date: 07/21/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Badger Canyon Substation Upgrades CX(s) Applied: B4.6Date: 07/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Ross-Lexington 12/2 Tower Stabilization Project CX(s) Applied: B1.3Date: 07/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Wyandotte Integrated Renewable Energy Strategy – WIRES 2 Award Number: DE-FG36-06GO086090 CX(s) Applied: A9, B5.19 Project Management Coordination Office Date: 07/21/2015 Location(s): MI Office(s): Golden Field Office
Categorical Exclusion Determination
Categorical Exclusion Determination
Categorical Exclusion Determination