Install New Freezestats in the 233-H Supply Air Handling Unit CX(s) Applied: B1.3Date: 04/06/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at K-Area (Crane Area) CX(s) Applied: B1.3Date: 04/06/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
National Oceanographic and Atmospheric Administration Sockeye Salmon Captive Broodstock Program Routine Maintenance CX(s) Applied: B1.3Date: 04/06/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
SMARTDATA:: Standardized multi-scale Models of Anonymized Realistic Distribution and Transmission data CX(s) Applied: A9Date: 04/06/2016 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Cleanup of Test Reactor Area 786 Diesel Spill CX(s) Applied: B6.1Date: 42465 Location(s): IdahoOffices(s): Nuclear Energy
Categorical Exclusion Determination
Drain Fire Water Tank in B-Area CX(s) Applied: B1.3Date: 04/05/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Temporarily Install Two Portable Diesel Generators CX(s) Applied: B1.31Date: 04/05/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Fire Department Foam Deployment Demonstration CX(s) Applied: B1.2Date: 04/05/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Periodic Training Burns at Fire Department Training Area CX(s) Applied: B1.2Date: 04/05/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office