Building 200 Steam and Condensate Repairs, ASO-CX-318 CX(s) Applied: B1.3Date: 07/15/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Argonne Enterprise Data Center, ASO-CX-317 CX(s) Applied: B1.15Date: 07/15/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Argonne's Washington, DC Office Renovation, ASO-CX-319 CX(s) Applied: B1.15Date: 07/15/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Wind Forecast Improvement Project 2 (WFIP2), Walla Walla (Monitoring Trailer), ASO-CX-315 CX(s) Applied: B3.1Date: 07/15/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Wind Forecast Improvement Project 2 (WFIP2), Yakima (Monitoring Trailer), ASO-CX-314 CX(s) Applied: B3.1Date: 07/15/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Wind Forecast Improvement Project 2 (WFIP2), Goldendale (Monitoring Trailer), ASO-CX-316 CX(s) Applied: B3.1Date: 07/15/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Remove Beaver Debris/Possibly Relocate Beavers from Stormwater Pond above Outfall N-15 CX(s) Applied: B1.3Date: 07/14/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
235-F Roof Replacement Warranty Repair CX(s) Applied: B1.3Date: 07/14/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Troy Substation Tap Yard Expansion CX(s) Applied: B4.11Date: 07/14/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Radiological Glovebox Research Activities at Central Facilities Area-625 CX(s) Applied: B1.31Date: 07/14/2015 Location(s): IdahoOffices(s): Nuclear Energy