Ultra-Efficient Turbo-Compression Cooling CX(s) Applied: B3.6Date: 07/17/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Safety and Tritium Applied Research Standby Power Upgrade CX(s) Applied: B2.5Date: 07/17/2015 Location(s): IdahoOffices(s): Nuclear Energy
Replace Bayou Choctaw Brine Disposal/Recycle Piping in Pump/Pond Area CX(s) Applied: B1.3Date: 07/17/2015 Location(s): None ProvidedOffices(s): Strategic Petroleum Reserve Field Office
Big Eddy-Troutdale No. 1 230 Kilovolt Transmission Line Mile 38 and 39 Priority Conductor Replacement Project CX(s) Applied: B1.3Date: 07/17/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Advanced Photon Source Upgrade Project - Multi-Bend Achromat Storage Rings and Superconducting Insertion Devices CX(s) Applied: B1.23, B1.31Date: 07/17/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Relocation and Installation of a Portable Restroom Facility, 704-38G CX(s) Applied: B1.22Date: 07/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Roof Repairs at 723-A CX(s) Applied: B1.3Date: 07/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace roofing system at 702-F CX(s) Applied: B1.3Date: 41799 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Repair Structure - CSWTF Grit Removal System CX(s) Applied: B1.3Date: 07/16/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Self-Regulating Surface Chemistry For More Robust Highly Durable Solid Oxide Fuel Cell Cathodes CX(s) Applied: B3.6Date: 07/16/2015 Location(s): MassachusettsOffices(s): National Energy Technology Laboratory