Fiscal Year 2016 Danger Pole Replacement Project for Fidalgo-Lopez #5 Structure 7/1 CX(s) Applied: B1.3Date: 02/12/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Keeler Substation Septic System Retirement CX(s) Applied: B1.27Date: 02/12/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Administration of the Wave Energy Converter (WEC) Prize Award Number: DE-EE0006738 CX(s) Applied: B5.15 Water Power Technologies Office Date: 02/08/2016 Location(s): MI Office(s): Golden Field Office
Development and Validation of Predictive Models for In-Cylinder Radiation and Wall Heat Transfer CX(s) Applied: A9Date: 02/11/2016 Location(s): CaliforniaOffices(s): National Energy Technology Laboratory
Miscellaneous Pump Maintenance Parts, 2016-2020 (Multiple) CX(s) Applied: B1.3Date: 02/10/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Repair Septic Tank Drain Field Located at the Jackson Barricade CX(s) Applied: B1.3Date: 02/10/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Environmental Surveillance, Education, and Research Program - Wastren Advantage, Inc. CX(s) Applied: B3.1Date: 02/09/2016 Location(s): IdahoOffices(s): Nuclear Energy
Wireless Test Bed Antennas at Energy Innovations Laboratory CX(s) Applied: B1.31Date: 02/09/2016 Location(s): IdahoOffices(s): Nuclear Energy
Site-Wide Routine Maintenance Activities, 2016 Update CX(s) Applied: B1.3Date: 02/09/2016 Location(s): New YorkOffices(s): West Valley Demonstration Project
McNary-John Day Transmission Line Mile 34-38 Access Road Repair Project CX(s) Applied: B1.3Date: 02/09/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration