Radioisotope Power System Heat Source Storage Project CX(s) Applied: B1.30Date: 02/01/2016 Location(s): IdahoOffices(s): Nuclear Energy
Liberty-Parker #1 Transmission Line Transfer to Western from Reclamation CX(s) Applied: B1.24Date: 02/01/2016 Location(s): CaliforniaOffices(s): Western Area Power Administration-Desert Southwest Region
State Energy Strategies and Innovation Studies Award Number: DE-FOA-0001496 CX(s) Applied: A9 Solar Energy Technologies Office Date: 02/01/2016 Location(s): Nationwide Office(s): Golden Field Office
Addition of a Class 3B Laser to the High Pressure Water Tunnel Project CX(s) Applied: B3.6Date: 02/01/2016 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
BPADNR Culvert Replacements CX(s) Applied: B1.3Date: 02/01/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Knight to Wautoma Fiber Project CX(s) Applied: B4.7Date: 02/01/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
NoaNet Fiber Installation at Columbia Substation CX(s) Applied: B4.7Date: 02/01/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Categorical Exclusion Determination
Categorical Exclusion Determination
Design of a U-230/Th-226 Generator System and Evaluation of Th-226 Chelation Chemistry CX(s) Applied: B3.12Date: 01/29/2016 Location(s): IllinoisOffices(s): Chicago Office