Excess Real Property Determination for Approximately 20 Acres of Self-Sufficiency Parcel
Aggregated Demand Response Demonstration Project Agreement CX(s) Applied: B4.4Date: 02/08/2016 Location(s): Multiple LocationsOffices(s): Bonneville Power Administration
Component Development and Testing for Electrolytic Cells CX(s) Applied: B3.6Date: 02/08/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Photocatalytic Oxidation of Volatile Organic Compounds CX(s) Applied: B3.6Date: 02/08/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Demolition and Removal (D&R) of 614-67G Air Monitor Station Storage Shed and 614-59G Air Monitor Station Storage Sheds CX(s) Applied: B1.23Date: 02/08/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Addition of a TAM unit and Modification of Existing Kanne Duct Point CX(s) Applied: B2.2Date: 02/08/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Chemicals, Metals, and Pesticides (CMP) Pits Equipment Removal and Placed Out Of Service CX(s) Applied: B1.23Date: 02/08/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Advanced Test Reactor Complex Road Repairs CX(s) Applied: B2.5, B1.3Date: 02/05/2016 Location(s): IdahoOffices(s): Nuclear Energy
Damper Installations on the Cougar-Thurston #1 Transmission Line Corridor CX(s) Applied: B1.3Date: 02/05/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Glen Canyon Substation Emergency Waterline Repairs CX(s) Applied: B1.3Date: 02/04/2016 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region