Kansas City National Security Campus (KCNSC), KCNSC25-04, Project No. 4939. Activity will take place at TA193, in the rightof-way (ROW) on the nort…
Upgrading mining site to 3-phase power. Trenching to place 3-phase line underground. Installation of a power vault and transformer. Installation of…
CX-033666: Establish Preventive and Predictive Maintenance to Enhance Grid Resilience in Fort Pierce
This project will involve the installation of 408 fault indicators and 18 automatic switches across 34 distribution feeders within the Fort Pierce …
Grid Resiliency project with new solid dielectric vacuum reclosers, capacitor bank, electronic controls/communications, air insulated switchgear an…
Paint F-Area steam pole brackets.…
Western Area Power Administration (WAPA), Rocky Mountain (RM) region proposes new formula rates for the Loveland Area Projects (LAP) transmission a…
1. Install new substation conduit and manhole system for 13kv distribution. 2. Install new conduit and manhole system for 13kv distribution. 3. En…
The Assembly side of 105-C has some insulation paneling that is coated with Asbestos Containing Material (ACM) mastic. A few panels have fallen and…
The original grease trap for 766-H is damaged and leaking gray water from the kitchen into the subsurface below. The damaged grease trap will be re…
CM 4493 Install light under awning weld test at 711-2N. Install supports for new LED fixtures and conduit under awning in 711-2N. Install new LED f…