Installation of smart meters on all 3210 meters in the system to allow for real-time data infrastructure to monitor and control outages and assist …
Replacement of select electrical infrastructure at TS4 and TS9.…
This project will design an optimized electrochemical system in anticipation of phase 2 field trials in which sodium hydroxide (NaOH) will be elect…
The project is aimed at revolutionizing vulnerability detection, classification, and exploitability determination techniques within control system …
Administrative and project management activities, computer modeling and analysis, field deployment of methane monitoring sensors (ground, vehicle, …
The objective of the project is to design a post-combustion carbon capture system. The work will consist of lab-scale experiments, a proof of conce…
This work scope at 704-30G trailer is to replace the North door. The completion of this work scope will include the working with Asbestos Containin…
The 2-inch Readco Mixer will be operated in EDL combining premix material with salt solution in order to create a grout waste form.…
This R and D activity will investigate the effects of various processing conditions on the synthesis of catalyst materials. Isotope exchange effici…
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes and Bands of the Yakama Nation (YN) Fisheries to implement a low tec…