Project management, site characterization, planning, modeling, and analysis. Planning and permitting for 2D seismic survey and geological (outcrop)…
In accordance with FCR M-FCR-A-00149 addressing configuration changes necessary for removal of the existing 780-1A Caustic Tank and Diaphragm Pumps…
Paint piping at 905-100F.…
The proposed work activity is to evaluate a hole in the ductwork of 221-F and perform the necessary repairs.…
This EEC covers repairs needed to the staircase in 717-10N that is damaged by termites.…
The Beasley lab investigates spatial ecology, population dynamics, and contaminant uptake for various wildlife on the Savannah River Site.…
Monitoring at the Mixed Waste Management Facility in support of the tritium phytoremediation project.…
Steel parts of 9975 shipping packages and 3013 storage containers will be cleaned with ethyl alcohol and wipes. Stainless steel fixtures will be as…
This EEC covers analytical methods for Radiochemical Measurements.…
This EEC covers various general renovations for Building 701-1A. Scope includes D and R such as replacing cabinets, flooring/cove base replacement,…