Replace bearings for on chilled water at 285-11F. The presumed asbestos containing material (PACM) gasket material at the flanges will be removed.…
Replace the tile flooring in the 701-1K Vestibule.…
Excavate to correct the domestic water supply line leak at MOX Concrete Batch Plant.…
NDE Inspection of the DBCF underground piping. The piping is approximately 7 ft below grade.…
The planned work scope is for the removal of floor tile and mastic known to contain asbestos in Room 54 of Building 713-N. Dispose of asbestos con…
Subcontractor will provide assembly and disassembly roof repairs at Building 105-L. The subcontractor "will not" disturb the existing roof while p…
Determine Solubility and Vapor Pressure of Monomethyl Mercury in Tank Waste Simulants Using Milestone Direct Mercury Analyzer (DMA-80).…
Award Number: DE-EE0008688 CX(s) Applied: A9, B3.6, B5.1, Building Technologies Office Location(s): FL Office(s): Golden Field Office
Award Number: DE-EE0007494 CX(s) Applied: A9, B5.1, B5.23 State Energy Program Location(s): WI Office(s): Golden Field Office
Project Management & Construction Services (PMCS) will be installing a new electric plant air compressor near Building 725-2N.…